Eaton - Powering Business Worldwide

CUSTOM DISTRIBUTION BOARD CHECK LIST

Email Address:
First Name:
Last Name:
Business Name:
Project:




Assembly Designation:
Completed by:
Date:




When selecting the best options for your Distribution Board project please consider the options listed below.
If you are unsure of the best selection or you simply don’t know the information due to it not being supplied by the end customer, Eaton’s DB solutions team will default to the answers marked in Pink Highlight in the Options Column. If you have special requirements please detail them in the blank column on the right hand side.

Category Design Criteria Options Specify your details here
Incoming Supply
Current Rating of Supply ≤250A, Other
Incoming Cable Size ≤1x95mm² per phase, Other
Cable Entry Top, bottom
Main Switch Position Top, bottom
Outgoing cables (circuit > 100A) Top, bottom
Distribution Board Assembly Information
IP Rating IP42, IP66
Colour Grey, Orange, Other
Number of poles 12-96 No default
Main Switch Rating 250A, Other
Enclosure
Size Restrictions No, Yes (Maximum dimensions)
Mounting arrangement Wall, Floor (including plinth)
More than one enclosures required No, Yes
Bolted top to bottom or side by side Top to bottom, Side by side
Cable access between bolted enclosure required No, Yes
Is there a detailed breakdown of circuit breakers for multiple chassis Yes, No (breakers supplied loose)
Electrical
Is there a wiring diagram No, Yes
Control Voltage 240VAC, 24VAC, 24VDC, Other
Is additional control circuit breaker allowed for in quote Yes, No (specify which circuit to supply from)
Control Schematic Supplied Yes, No (equipment fitted only, not wired)
Mounting of Power Meters DIN – (Eaton – EMC3P-D2C),
Panel Mount – (Eaton-EM3P-P2P1KIT)
CT Ratio for Metering 250/5, Other (should match incoming supply rating)
Is there any free-issue equipment? No, Yes
Who is wiring free-issue equipment EATON Customer
Does the quote include costs for labour for wiring of free-issue equipment Yes, No (equipment fitted only, not wired)
Logistics
Delivery Date Match the workshop schedule,Other
Address for delivery Match the sales order, Other
Are there any site delivery restriction times No Specify site opening times
Special Delivery Requirements (crane truck, tail lift truck etc)? No Specify specific requirements