Installation checklist for Eaton Green Motion Chargers

Please fill in and sign this document.

Prior to installation it is required to download, read, and understand the step-by-step instructions from the latest installation manual provided. This checklist is supplementary and does not replace the installation manual. The checks described here must be carried out only by professional installers.

You can visit the central product page to find your specific charger model and download additional resources, including technical documentation at:

https://www.eaton.com/ch/en-gb/products/emobility/ev-charging.html

If the information in this form applies to multiple chargers of the same model, please list all serial numbers this information is true for. Please complete a separate form to describe any exceptions.

Note: Enabling the charging station may take up to 48 working hours.


General information


Installation checklist

1.1 TECHNICAL DOCUMENTATION

1.2 PACKAGING / TRANSPORT

1.3 CONNECTION CHECKS

Note: The charger will not operate properly if the phase sequence is not correct